Apr 06 2023
Case Study: Deluge Inspection, Repair & Maintenance
A number of offshore production platforms had multiple deluge nozzle blockages when testing fire water systems. To remain compliant the wet testing cycle was repeated more frequently, less than three months instead of annual. This increased disruption to operations, but critically was accelerating the corrosion of plant, structures & equipment.