Drilling
Optimization
Production
Enhancement
Well
Intervention
Fire
Protection

High Expansion Plug Setting

High expansion plug setting

High Expansion Plug Setting


Zonal isolation or permanent abandonment at the reservoir can be incredibly challenging and, in some instances, impossible to achieve thru-tubing using conventional technologies. Paradigm’s high expansion plug family enables conveyance through tight completion restrictions and set in casing diameters multiple times larger than their run-in-hole diameter.

This ensures efficient cost-effective reservoir isolation or abandonment as there is no need to pull the completion which in turn means the intervention can be completed offline.

To give our high expansion plugs permanence we always recommend spotting a minimum of 10ft of cement on top of the plug. Moreover, this can be simply conveyed offline using our slim gravitational cement bailer system.

This is a service from Paradigm Intervention Technologies

> Company Home

> Contact
Back to top